Friday 22 March 2013

Day 49: Sauna, Doors, and Final Paint

On Monday and Tuesday (Days 48 & 49, 18th–19th March) a lot of work happened again. Following up from the arrival of the sauna stove, the sauna benches are now installed. The stove will come later since it needs to be wired in by an electrician.

Also the doors are now installed. The photo above shows the door separating the vestibule from the hallway and the rest of the house. The cable above the door is probably for the door bell. Let's hope it's not going to be a totally horrible sound – we didn't get to choose that!

Also the door to the shower room (above) and the clear-glass door between shower and sauna are now installed.

Finally, the last bit of unpainted space got its finishing: the small bathroom's rear wall is now painted in an intense green ("Lime").

No comments:

Post a Comment