On Day 44 (13th March), the floors were tiled, and that meant pretty much "access denied," because the floors inside both doors are tiled. Thus the only access was via the terrace door.
The small bathroom looks great with the tiles and the light-green paint, very fresh. We can't wait to see the rear wall painted. The paint for that we selected to match an old Finnish poster, so we'll need to get that framed soon, too.
The final photo for Day 44 shows the view into the utility room. In the far end there's the lower part of the door to the outside just visible, still covered up with protective cardboard. Off to the left at the far end, i.e. behind the protruding wall, lie the shower room with attached sauna.
No comments:
Post a Comment