Sunday 24 March 2013

Day 51:Furniture Fronts and Bathroom

On Day 51 (21st March), the furniture got its fronts, meaning doors and drawers were installed, and even the kitchen appliances appeared. Above the small bathroom with sink, drawers, and mirror. The camera flash created an interesting pattern on the rear wall.

The utility room is pretty much finished now. The tall empty slot under the ventilation system is reserved for washing machine and tumble dryer. The tall closet contains two big and one small baskets for laundry, which is very handy right next to the washing machines.

The wardrobe in the entrance area now has doors and the final look became apparent. Lots of storage space here.

Finally a huge improvement on the kitchen, compared to the previous day. All doors installed, and cooker, hobs, sink, dishwasher and drawers installed. Also the tiles have now received their white grouting, the extractor fan is installed, and its "exhaust" pipe is hidden behind some neat white box.

Also the wooden strips in the corners between walls and ceiling is now finished in the much of the living room and half of the hallway. It's all coming together rapidly.